Typologies:
Residential
Status:
Concept
Year:
2025
Location:
Russia, Moscow
Area:
33 000 m²
Client:
MR Group
Works list:
Architectural Concept
Sign above the subway tunnel
A subway tunnel runs beneath the site. A rectangular volume within its boundaries would limit the floor area to just 800 m² which is uneconomical for an office building. The solution is to extend part of the structure as a cantilever over the subway: this increases the floor area to 1,200 m² while also creating the tower’s dynamic, stepped silhouette.

Ground Floor and Stylobate
A stylobate with an accessible roof: the first floor houses retail space, a utility room, and a unloading area. The roof of the stylobate features a landscaped terrace with a cube-shaped art installation.

Building Foundation
According to geological survey data (boreholes 30 and 31), bedrock and hard clay are present at elevation 122.000. The selected building design is supported by a pile foundation: 27-meter-deep pile columns rest on hard clay or bedrock.



Project team
Name | Position |
|---|---|
Evgeny Svyatkin | Project team leader |
Nikita Gridin | Architect |
Olga Galeta | Lead Architect |
Yulia Petukhova | Architect |