Work under the competitive project of Shcherbinka water tower redevelopment has begun

with acquaintance to history of the place and communication with residents of the area.
Work under the competitive project of Shcherbinka water tower redevelopment has begun with acquaintance to history of the place and communication with residents of the area.
506 м2

It turned out that the Tower is very symbolical for them. The building around has been constantly changed, but the Tower remained the same, so for people it’s associated with their children’s memoirs, personality formation and important emotions. From discussions we have concluded the strategic decision — we are going to perform the most delicate work with the building and try to keep the tower’s silhouette. For this purpose we have lifted the multipurpose hall — it is located on the second floor, having left the tower basis open. In uniform style with the volume of the second floor, the add-on is made that increases the tower height a little, makes it more noticeable and at the same time increases the operational area — basically, the co-working zone will be right there. When we have lifted the volume, we created two entrance groups, comfortably organized, protected from rainfall.

The concept was driven by not only desire to keep the place history, but also by physical restrictions of the space. The tower is located in the limited conditions, from three sides it’s surrounded with highways. We have been constrained in shaping of the multipurpose hall on the second floor, and that’s how the flexible, delicate form of the hall was born. On the first floor the cafe is located, it repeats a spot of the Tower construction and can work separately from the Tower.

One of the major tasks which we set for ourselves is to attract people. We developed various scenarios of the Tower usage which have formed the basis of functional zoning and space-planning structure. We found it really important to reactivate the object, make it alive, active space again. We parted human streams using the classical scheme — visitors come into the elevator (the elevator shaft is taken outside the initial Tower volume), get up to the last floor and then they go down by stairs, examining the exhibition. We have filled new overlappings and created the Tower floors. In total there are six of them. In the Tower permanent and temporary exhibitions will be showed, and walls will act like show-windows for current events. In the multifunctional hall there can be exhibitions, meetings, conferences, neighborhood events held.

In warm season concerts and sport events can be organized here — a part of the hall facade, a big shutter, can be opened, allowing music to extend. Initially we were planning this shutter in order that there was a possibility of delivery of large exhibition samples, but then we decided that it is also an excellent way of communication of the Tower with environment. That is how we got the idea of concerts and performances in warm season.

Read more

Typology:

Reconstructing

Status:

Concept

Year of design:

2018

Location:

Russia

Square:

506 м2

About project:

It turned out that the Tower is very symbolical for them. The building around has been constantly changed, but the Tower remained the same, so for people it’s associated with their children’s memoirs, personality formation and important emotions. From discussions we have concluded the strategic decision — we are going to perform the most delicate work with the building and try to keep the tower’s silhouette. For this purpose we have lifted the multipurpose hall — it is located on the second floor, having left the tower basis open. In uniform style with the volume of the second floor, the add-on is made that increases the tower height a little, makes it more noticeable and at the same time increases the operational area — basically, the co-working zone will be right there. When we have lifted the volume, we created two entrance groups, comfortably organized, protected from rainfall. Read more

The concept was driven by not only desire to keep the place history, but also by physical restrictions of the space. The tower is located in the limited conditions, from three sides it’s surrounded with highways. We have been constrained in shaping of the multipurpose hall on the second floor, and that’s how the flexible, delicate form of the hall was born. On the first floor the cafe is located, it repeats a spot of the Tower construction and can work separately from the Tower.

One of the major tasks which we set for ourselves is to attract people. We developed various scenarios of the Tower usage which have formed the basis of functional zoning and space-planning structure. We found it really important to reactivate the object, make it alive, active space again. We parted human streams using the classical scheme — visitors come into the elevator (the elevator shaft is taken outside the initial Tower volume), get up to the last floor and then they go down by stairs, examining the exhibition. We have filled new overlappings and created the Tower floors. In total there are six of them. In the Tower permanent and temporary exhibitions will be showed, and walls will act like show-windows for current events. In the multifunctional hall there can be exhibitions, meetings, conferences, neighborhood events held.

In warm season concerts and sport events can be organized here — a part of the hall facade, a big shutter, can be opened, allowing music to extend. Initially we were planning this shutter in order that there was a possibility of delivery of large exhibition samples, but then we decided that it is also an excellent way of communication of the Tower with environment. That is how we got the idea of concerts and performances in warm season.

Project team

Amir Idiatulin
Andrey Sidorov
Polina Tsybenko
Nikolay Faneev
Sergey Shishkin
Keira Kompanets

Project details

Concept
2018
Russia
506 м2
Senior Finnish School
Next project
Подробнее
Закрыть
000
The concept of a modern school
001
Omsk airport
002
Waterfront “The Nature of Electricity”
003
Gustav Creative Industries Technopark
004
Hotel complex “Mountain Village”
005
Cultural Center Riyadh
006
Innovative school in Dubai
007
New resort in Sheregesh
008
Valley of Wellness
009
STONE Dmitrovskaya
010
Residential Complex in Almaty
011
Innovation Cluster
012
Student Hub
013
Campus Freedom
014
OzMakon Apartments Complex
015
Hotel Katun
016
IT university, Kazakhstan
017
Business center QOOB on Sviridova St.
018
Bali Village
019
Reconstruction DSK-500
020
MTS Office
021
Yakutsk Master Plan
022
Ecopolis on Sakhalin
023
The concept of a business center
024
City Pavilion Shagal
025
Digital Lab
026
Master plan Samara-Arena
027
Master Plan of Almetyevsk
028
Music Museum in Cyprus
029
School in Burabay
030
Master Plan of the central embankment of Sochi
031
IT Research Center
032
Simple Office
033
Raiffeisen TechCenter
034
Master Plan of Lishui, China
035
Xingfu Village Pan-Museum, China
036
Headquarters of the Samolet Group
037
Woodstock
038
Water Tower Redevelopment Concept
039
Senior Finnish School
040
Derbent Master Plan
041
Reconstruction of the Center of Contemporary Art NPAK in Yerevan
042
Klenovyi Bulvar Subway Station Concept
043
Sibur Office
044
The Rocky Shore Winery
045
L’ORÉAL Office
046
Lamoda Office
047
Residential complex in Tushino
048
Sales office for Paveletskaya City residential complex
049
Apartments at the Bolshevik Factory
050
Golden Section School
051
Immersive Theater and Museum, Kaifeng
052
“Lighthouse” Moscow Children’s Hospice
053
Residential complex on the Moskva River
054
Concept of Eco Hotel in Konakovo
055
Aquatoria MFC
056
Space 1 Office on Tverskoy Boulevard
057
Residential complex in the center of Moscow
058
Showroom Chkalov
059
Incanto
060
Nuclear Power Pavilion at VDNKh
061
Kaban Lakes Embankments Concept
062
BPC Banking Technology
063
RD Construction Office
064
IND Office
Close